Static concept site

Summariser / Reframed

Build Mode

Single HTML / inline CSS / inline JS

Intent

Mockup only, no live APIs

Field day at a glance

A calmer, technician-facing summariser. Chronology first, routing second, notes always visible.

Read-only calendar framing
Selected day Fri 07 Mar 3 visits, 1 manual stop, 68 route miles
Departure window 07:10 First live route begins after coffee stop
Attention flag 2 fragile notes Choir loft access and parking permit collection
08:30
90 min booked
Event 01
Install Live first stop

St Mark's Hall audio tidy + handheld swap

St Mark's Hall, Easton, Bristol BS5 0QQ

Clean brief Check amp rack hum, replace one Sennheiser handheld, confirm lectern preset and leave a laminated quick-start.
Structured notes Access via side gate. Custodian opens at 08:10. Old handheld stays onsite for warranty collection.
11:15
60 min booked
Event 02
Maintenance Permit needed

Redland Parish livestream confidence check

Redland Parish Centre, Bristol BS6 6TB

Overview Run a full Sunday rehearsal path: camera preset recall, HDMI confidence feed, and lower-third laptop handoff.
On-site caution Parking permit in pigeonhole marked AVD. Choir loft ladder cannot be left out during rehearsal.
14:00
120 min booked
Event 03
Survey Last call

Clifton studio projection survey + cable path sketch

The Clifton Rooms, Bristol BS8 1HB

Client ask Measure throw distance, note ceiling void depth, capture projector noise concerns, and photograph rack corner.
Deliverable cue Survey output should drop cleanly into CMP later. Mockup keeps the notes prominent so they are not buried behind tabs.

Stop order

Manual stops stay first-class. Legs remain adjacent-only.

No auto optimisation
1
Depot coffee + cable grab

Manual stop inserted before the first appointment. Collection shelf C4, label already printed.

12m
2
St Mark's Hall

Hum check, mic swap, quick-start left behind.

24m
3
Redland Parish Centre

Permit pick-up needed before unloading. Choir loft restriction in the notes.

19m
4
The Clifton Rooms

Survey close-out. Capture photos, dimensions, and rack access comments.

13m

Route sheet

Map present, but quiet. Leg detail stays subordinate to the day plan.

Adjacent legs only

Technician briefing

The summary surface is closer to a run sheet than a dashboard.

Context stays visible
Access and timing

First keyholder arrives 20 minutes before the 08:30 booking. Redland permit must be collected before unloading. Final survey contact leaves by 16:30.

Kit and spares

Take one spare XLR, Sennheiser handheld, laminated quick-start, and laser measure. No scaffold tower needed for this run.

Admin handoff

The final site notes should be clean enough to become a CMP consultation summary later, so the mockup keeps logistics and deliverables side by side.

Exports + actions

The control area is flatter and quieter than the current button-heavy tool chrome.

Mockup only
Print run sheet One-page field handoff with timings, access notes, and adjacent-leg summary.
PDF
Copy clean notes Technician-ready notes with signatures, separators, and clutter stripped out.
Clipboard
Prepare CMP handoff Carry the final survey notes forward without turning this screen into a data-entry app.
Future

Reserved page

Slot 02 is waiting for the next mockup.

The shell is already in place. Future pages can reuse the selector, title framing, and single-file hash routing without changing the deployment shape of the site.

Reserved page

Slot 03 stays open for later tool concepts.

This placeholder keeps the navigation honest: the site is built as a mockup catalogue, but only the Summariser concept is implemented in this first release.